Second Floor Framing

by generalmom

The last stair was nailed and I got to climb up to our new second floor. I just put my hand over my heart and the view took my breath away.

20131114-180659.jpg

20131114-180718.jpg
That is the view from the kids bedroom and our master bedroom is to the right of the scaffolding. This is the balcony looking over to the front door and front stairs.

20131114-180932.jpg

20131114-180939.jpg
Framing the second story begins tomorrow and the lumber was delivered today. We still have water, electric and septic to trench before it rains. We should have our roof on in 4 weeks but I’m shooting for 3.5 weeks. Windows will be delivered December 2! I had last minute final decisions that had to be made about door heights, closet heights, pocket doors and newly found usable space. Never a dull moment when building a home!

20131114-181847.jpg

Advertisements